Bulk materials

Topsoil Calculator

Topsoil is heavy, roughly a ton per cubic yard, so knowing the weight matters as much as the volume. Enter your area and depth for yards, bags, and delivered tonnage.

Updated

Area to cover

Add a section for each part of the space. Odd shapes are easiest as two or three simple ones.

Dimensions
ft
ft

Area = length × width

Total area

Material and depth

Heavy. A single cubic yard runs past a ton, check your vehicle's payload rating.

4–6 in for a new lawn. Never more than ½ in at a time over living grass.

%

5% covers settling and uneven ground. Use 10% on rough or sloped sites.

The standard retail size.

lb / cu yd

Only affects the weight figures, never the volume. Typical range 1800–2700 lb/cu yd, wet material sits at the top.

Enter your measurements to see results.

How this is calculated

Volume and the weight problem

The volume math is the same as any bulk material: area times depth, converted to cubic yards. What sets topsoil apart is density. Screened topsoil runs about 2,200 lb per cubic yard, and wet topsoil runs higher still.

That matters for logistics more than for cost. A half-ton pickup rated for 1,500 lb of payload can carry roughly two-thirds of a cubic yard of topsoil, not the two yards people often try to load.

tons = cubic yards × 2,200 lb ÷ 2,000

How deep for each job

Filling low spots in a lawn is the one case where less is more. Never add more than half an inch of soil over living grass at a time, deeper and you smother it. Repeat every few weeks until the spot is level rather than doing it in one pass.

Building a new planting bed wants 6 to 12 inches of workable soil. Establishing a new lawn from bare ground wants 4 to 6 inches over the subgrade.

Topsoil settles. Freshly spread soil loses roughly 10 to 20% of its loose volume once it is watered and walked on, which is worth building into the order for anything you need to finish at a specific grade.

Typical depth by job
JobDepthNote
Topdressing an existing lawn¼–½ inNever bury the crowns of live grass
Leveling before new seed2–4 inRake to grade, then firm
New lawn over subgrade4–6 inBelow 4 in, roots hit compacted fill
New planting bed6–12 inDeeper for vegetables and root crops
Raised bed fill10–18 inBlend with compost, see raised bed calculator

Worked example

Building up a new lawn area

Spreading 4 inches of topsoil over a 25 ft × 40 ft area before seeding.

Area
25 ft × 40 ft = 1,000 sq ft
Volume
1,000 × (4 ÷ 12) = 333 cu ft
Cubic yards
333 ÷ 27 = 12.3 cu yd
Weight
12.3 × 2,200 = 27,100 lb ≈ 13.6 tons

About 12.5 cubic yards. That is a tandem dump truck load, not something to move by pickup, at 13.6 tons it is three or four full loads for a one-ton truck.

Frequently asked questions